Prepare Concrete To Ensure It Remains Crack-Free

A concrete driveway is expensive, but it will last for decades if it’s properly installed. Good finishing techniques will make a slab look great for a while, but proper ground prep will keep it looking that way over its lifetime. We spent a day on the job with a longtime concrete pro (they don’t like to be called cementheads). He gave us some great tips on how to prepare a site for a pour. He couldn’t stress enough that the most important steps for cement slab installation are done before the cement truck arrives.

A good base is everything!

Concrete will crack and crumble if it’s not poured over a solid, stable base. Bringing in 4 to 6 in. of a good compactable base is a good rule of thumb, but the exact amount of base for your driveway depends on the condition of the existing soil, the climate, and what you plan to park on your driveway. You may be able to pour directly over sandy or gravelly soil without bringing in any additional base. But if you live in a cold climate, are pouring over heavy clay or organic soil, or plan to park heavy vehicles on the driveway, you may want to increase the base layer to 10 or 12 in. The best way to find out how much base you need is to contact the nearest concrete supplier. If you explain your soil conditions and the slab’s intended use, the supplier should be able to recommend the proper base depth and the type to use and provide contact info for a nearby base supplier. Your municipality may also have a handout of recommended base depths in your area.

Compact each layer of base

Make three or four passes with a plate compactor every time you add 2 in. of base, or “lift” (each layer you add is called a lift). Use a vibrating plate compactor like this one instead of the type that jumps up and down, sometimes referred to as a “rammer” or “jumping jack.” Those are designed for compacting soil when backfilling trenches, not for compacting base.

Dampen the base

Super-dry base doesn’t compact well. So if you’re preparing the base layer in dry conditions, add a little moisture by spraying down each “lift” with a garden hose to achieve maximum compaction. Check to see if your base material has enough moisture by grabbing a handful and compressing it into a ball. If it holds its shape, you’re good to go. Add water if it completely crumbles. Oversaturated base won’t compact either, so don’t spray so much water that it starts pooling. Adding water to every lift also helps keep the dust down.

Keep forms straight

Stretch a string between two screws installed at the edge of both ends of the form boards. The string will act as a guide to keep the form boards straight. Set the forms at the proper height before bringing in the last lift. That way you can use the forms themselves as a guide for the final base height.

Secure the forms

Place a stake at least every 3 ft. Use your foot to align the form board to the string as you drive each stake. Try to drive the stakes in straight and flush with the board so the form doesn’t get pulled out of alignment when you fasten it. Scab a board onto the splice if more than one board is needed on a side. Backfilling dirt against the forms before you pour will also help keep them in place.

Screw the stakes

Secure the stakes to the form boards with screws instead of nails (Torx-head screws work well). Pounding in nails can loosen stakes and knock everything out of alignment. Don’t install the screws too low or they’ll be tough to remove if the forms are backfilled. It’s OK if screws protrude into the pour area if the edge of the concrete won’t be visible; they’ll easily spin right out, and the small hole won’t be a problem.

Cut stakes flush

Cut the stakes off flush with the top of the form boards so they won’t get in the way of screeding when it’s time to pour. A recip saw can rattle a form out of alignment. If you do use one, wait until all the stakes are in, and don’t use a super-aggressive blade. Make sure to knock down the grade near the forms so it won’t interfere with the screed board.

Reinforce with rebar

Our expert prefers to install 1/2-in. rebar in a 2-ft. grid pattern when pouring driveways. He ties the rebar together with precut rebar ties fastened with a tie-wire twister. Use enough ties so the grid will stay together if it’s accidentally stepped on while suspended in the air.

Cut rebar with a grinder

A grinder fitted with an abrasive metal-cutting blade is a good setup to cut rebar. A lot of contractors swear by the $15 diamond masonry blades even though they’re not specifically approved for metal.

Bend rebar around corners

Rebar can be easily bent with this simple rebar bender ($30 at concrete supply companies). If you have only a few bends to make, standing on the rebar and pulling it up into shape works for rebar 1/2 in. and smaller.